90 RULAND ROAD:

AVAILABLE Q1 2022

235 pINELAWN ROAD:

AVAILABLE Q3 2022

90 RULAND ROAD:

AVAILABLE Q1 2022

90_ruland_site_plan.png

Total Building (SF):

±246,500 SF

Office space can be built up to ±27,160 SF

Additional mezzanine possible

Structure:

Steel frame, beams, columns, roof, joists

Column Spacing:

56' x 57'

Column Spacing at Speed Bay:

59' x 57'

Exterior:

Pre-cast concrete, insulated load-bearing walls

Floor Capacity:

Warehouse/Office: 8" concrete slab (800lb/psf)

Roof:

Fully adhered EPDM, R=30

HVAC:

Warehouse: Roof-mounted Cambridge units

Office Area (Core & Shell): Multiple electric cooling/gas-fired constant volume rooftop units per tenant requirement

Electrical:

2,500 amps, 277/480 volt service to the building (warehouse)

Fire Protection:

Warehouse: NFPA-13 2016 Edition Section 8.12-Early

Plumbing:

Suppression Fast Response Sprinkler System 6" lateral sanitary connections are provided 2" domestic water service is provided

Office Floor to Ceiling Height: 

18'0"

Warehouse Clear Ceiling Height: 

40'0" to underside of steel at lowest point of roof structure

Loading:

(51) 9'0" x 10'0" loading docks w/ 35,000lb rated levelers

(2) 12'0" x 16'0" drive-in doors

Construction Class:

Group S-1 and B

Car Parking:

495

Trailer Parking:

105

235 pINELAWN ROAD:

AVAILABLE Q3 2022

235_pinlawn_site_plan.png

Total Building (SF):

±599,983 SF

Office space can be built up to ±30,758 SF

Additional mezzanine possible

Structure:

Steel frame, beams, columns, roof, joists

Column Spacing:

54' x 56'

Column Spacing at Speed Bay:

61' x 63'

Exterior:

Pre-cast concrete, insulated load-bearing walls

Floor Capacity:

Warehouse/Office: 8" concrete slab (800lb/psf)

Roof:

Fully adhered EPDM, R=30

HVAC:

Warehouse: Roof-mounted Cambridge units

Office Area (Core & Shell): Multiple electric cooling/gas-fired constant volume rooftop units per tenant requirement

Electrical:

2,500 amps, 277/480 volt service to the building (warehouse)

Fire Protection:

Warehouse: NFPA-13 2016 Edition Section 8.12-Early

Plumbing:

Suppression Fast Response Sprinkler System 6" lateral sanitary connections are provided 2" domestic water service is provided

Office Floor to Ceiling Height: 

18'0"

Warehouse Clear Ceiling Height: 

40'0" to underside of steel at lowest point of roof structure

Loading:

(120) 9'0" x 10'0" loading docks w/ 35,000lb rated levelers

(2) 12'0" x 16'0" drive-in doors

Construction Class:

Group S-1 and B

Car Parking:

479

Trailer Parking:

171